Neighborhood street of tile-roof homes with palm trees
Florida roof guide

Florida re-roof code requirements

Last reviewed September 27, 2026

Short answer: When a Florida roof is torn off and replaced, the Florida Building Code requires a secondary water barrier under the new roof covering. On older homes with wood roof decks, the deck usually has to be re-nailed to current standards, and some higher-value homes near the coast also need roof-to-wall connections upgraded. These items belong in your quote and your permit. If they are missing, ask why.

Which code applies

Re-roofing an existing home falls under the Florida Building Code, Existing Building, Section 706 (Reroofing). The current edition is the 8th edition (2023), which took effect on December 31, 2023. Your roofer pulls a re-roof permit, and the local building department inspects the work, often including an in-progress inspection before the new covering goes on.

A roof-over (new covering installed over the old one without tear-off) is limited by code and is not allowed in many cases, such as when the existing roof is wet or damaged or already has two layers. Most Florida re-roofs are full tear-offs.

Secondary water barrier

A secondary water barrier is a sealed layer between the roof deck and the roof covering. If a hurricane strips shingles or tiles, it keeps rain out of the attic. Florida requires it when the roof covering on an existing wood-deck roof is removed and replaced.

Common ways roofers meet the requirement:

The exact methods allowed depend on the roof covering, the slope and whether your home is in the High-Velocity Hurricane Zone (Miami-Dade and Broward). Your roofer’s permit documents should name the method.

Secondary water resistance is also one of the features on the Florida wind mitigation form. A full self-adhered layer can earn an insurance credit that tape-only methods may not. Ask your agent before you choose. See our wind mitigation guide.

Roof deck re-nailing

Many Florida homes built before the modern code have roof sheathing held down with staples or small smooth nails, which can let the deck peel off in high wind. When the roof is torn off, the code requires the deck attachment to be checked and, where it falls short, re-nailed. The typical fix is 8d ring-shank nails at a tighter spacing set by the code for your wind zone.

Roof-to-wall connections on higher-value homes

For some existing homes, a re-roof also triggers upgrades to how the roof framing is tied to the walls, such as adding straps or bracing gable ends. This generally applies when the home:

The code caps the required spending on this work at a percentage of the re-roof cost, and some structural work must be done by a licensed building, residential or general contractor rather than a roofing contractor. Your building department can confirm whether your home is covered.

What this means for your quote

ItemWhat to check in the quote
PermitRoofer pulls it, and the fee is included
Tear-offAll existing layers removed and disposed of
Secondary water barrierMethod named (full peel and stick, seam tape, or double underlayment)
Deck nailingRe-nailing to current code included
Rotten woodPrice per sheet of plywood and per linear foot of fascia
Flashing and ventsNew drip edge, pipe boots and vents
WarrantyWorkmanship warranty in years, plus the manufacturer warranty

Two quotes can differ by thousands of dollars because one includes full peel-and-stick and re-nailing while the other uses the minimum. Compare line by line, not just the total. For price ranges by material, see Florida roof replacement cost.

If the roof is being replaced after a storm

See the price for your roof

Enter your address. We measure your roof from satellite and show Florida price ranges by material. No phone number needed.

Frequently asked questions

Is a secondary water barrier required in Florida?

Yes, when the roof covering on an existing roof with a wood deck is removed and replaced. The Florida Building Code, Existing Building, Section 706 sets the requirement and the allowed methods.

Do I have to re-nail my roof deck when I replace my roof in Florida?

Usually. When the deck is exposed during a re-roof, Florida code requires the attachment to be checked and brought up to current standards where it falls short, typically with ring-shank nails at tighter spacing.

Is peel-and-stick underlayment worth it in Florida?

A full self-adhered layer gives the most protection if shingles or tiles blow off, and it may earn a larger wind mitigation credit than seam tape. Ask your agent how much it would change your premium before deciding.

How long do I have to file a roof insurance claim in Florida?

Florida Statute 627.70132 gives one year from the date of loss to file a new or reopened claim and 18 months for a supplemental claim. Your policy may have additional notice requirements.

Can a roofer pay my insurance deductible in Florida?

No. Florida Statute 489.147 bars contractors from offering to waive your deductible, or offering rebates, gifts or cash, in exchange for a roof inspection or an insurance claim.