Typical Cape Coral price: about $10,500 to $16,500 for architectural shingles on about 2,000 square feet of roof surface. Measure your roof for a number based on its real size.
Roofing in Cape Coral
Cape Coral took heavy damage from Hurricane Ian in 2022. Many roofs were replaced afterward, while others are still original. Tile and shingle are both common.
Cape Coral roof prices by material
| Material | Per square installed | 22-square roof | Lifespan |
|---|---|---|---|
| Architectural shingle | $475 – $750 | $10,500 – $16,500 | 20–25 yrs |
| Impact-resistant shingle | $600 – $925 | $13,000 – $20,500 | 20–30 yrs |
| Metal, exposed fastener (5V) | $800 – $1,200 | $17,500 – $26,500 | 30–40 yrs |
| Metal, standing seam | $1,000 – $1,800 | $22,000 – $39,500 | 40–60 yrs |
| Concrete tile | $1,000 – $1,900 | $22,000 – $42,000 | 40–50 yrs |
| Flat roof (TPO / modified) | $600 – $1,100 | $13,000 – $24,000 | 15–25 yrs |
Before you hire a roofer in Cape Coral
- Get at least three written quotes that use the same square count.
- Confirm the permit will come from the City of Cape Coral building department (or Lee County for unincorporated addresses).
- Check the roofer’s license at MyFloridaLicense.com.
- If your insurer sent a roof letter, read what Florida law allows first.
- Update your wind mitigation report after the job.
Get your Cape Coral roof price
Enter your address. We measure your roof from satellite and show Florida price ranges by material. No phone number needed.
Frequently asked questions
How much does a new roof cost in Cape Coral, FL?
For about 2,000 square feet of roof surface, architectural shingles run roughly $10,500 to $16,500 in Cape Coral. Standing seam metal and concrete tile run about $22,000 to $42,000. Measure your roof by address for a number based on your actual roof.
Who issues roof permits in Cape Coral?
For homes inside city limits, the City of Cape Coral building department issues reroof permits. Homes in unincorporated areas with a Cape Coral mailing address go through Lee County. Your roofer normally pulls the permit.
